HOW TO USE THE PENSION BONUS SCHEME SYSTEM |
Purpose of instruction |
The purpose of this Departmental Instruction is to provide user notes on the procedure for recording a person's pension bonus details on the Pension Bonus System. |
Contents of instruction |
This instruction contains the process to be followed to allow the recording of details on the Pension Bonus System. |
Authorised by |
R. J. HAY BRANCH HEAD INCOME SUPPORT |
Claims Management System (CMS)
Introduction |
To register a pension bonus case on the CMS the following action should be taken. |
Classify Pension |
Proceed to the CM.CP screen within CMS.
-Pension bonus rego -Pension bonus review
|
Attributes |
Pension Bonus Registration
Proceed to the CM.UA screen and select one of the mandatory attributes
[9]
.
Note: A future system change will remove the need for mandatory attributes for pension bonus scheme. [9] (go back)The mandatory attributes are:
You will then be given the choice of selecting the manual action
[10]
attribute if required.
Please note, at this stage there are no circumstances that we can ascertain that may require the manual action attribute for pension bonus. The need for this attribute for pension bonus purposes is therefore to be reviewed. [10] (go back)Pension Bonus Review Select one of the two attributes for this class type on CM.UA screen. The attributes are:
|
Stage Complete |
Use the CM.SC screen if the case needs to be withdrawn. This is the only option available for pension bonus or all cases on this screen. |
Pension Bonus Scheme System
Introduction |
The pension bonus scheme system is a separate system incorporated into PIPS/PC. The following instructions on how to use the system do not cover any policy aspects of the scheme. For help with any policy inquiries refer to Departmental Instruction number C34/98 titled: Pension Bonus Scheme. |
Processing Pension Bonus Claim |
The following step/action table will demonstrate how to process a pension bonus claim. |
STEP |
ACTION |
SCREEN SHOT |
1 |
Open PIPS/PC. |
|
2 |
Select case on the Menu title bar. |
|
3 |
Select Pension Bonus Claim. |
A |
4 |
Type in file number and press enter. |
B |
|
C |
|
5 |
Select case details. |
C |
6 |
Select persons to be included in the case. |
|
|
D and E |
|
7 |
A number of fields within this screen will have defaulted. It will not be possible to change these fields. If at any stage you do not want to continue press the BACKOUT button. If you are processing a case with two clients you must fill out both clients details. Enter type of pension deferred by clicking on the drop box and selecting one of the four options:
|
D and E |
Continued on next page
STEP |
ACTION |
SCREEN SHOT |
8 |
Enter Eligibility for Pension by clicking on the drop box and selecting one of two options:
|
|
9 |
Enter Date Application Lodged. |
|
10 |
Enter previous pension history by clicking on the drop box and selecting on of three options:
|
|
11 |
Enter Registration date. |
|
12 |
Click on the Details button. |
|
13 |
This screen gives you the option to ADD, DELETE or SORT the following: ·Work History ·Disposal of Assets and ·Periods of Non Accrual After performing this function select Update followed by Close. |
F |
14 |
If you wish to add Notes click on the notes button. This will take you to a free text screen where any notes can be added. Click OK when finished. |
|
15 |
Press update |
|
16 |
Press Close if you wish to do further work on the case later. Press Finalise to complete the case. |
Pension Bonus Scheme – Transfers in
Processing a Transfer In. |
The following steps should be followed to process a transfer in. |
STEP |
ACTION |
SCREEN SHOT |
1 |
Open PIPS/PC. |
|
2 |
Select Case on the menu title bar. |
|
3 |
Select Pension Bonus Claim. |
A |
4 |
Type in file number and press enter. |
B |
5 |
Select case details. |
C |
6 |
Select persons to be included in case. |
|
7 |
Enter file number in the Transfer from Interstate screen and press enter. |
G |
8 |
If the details copied to this screen are correct, click on the Finalise button. |
G |